Skip to product information
1 of 8

27PMJIEP1OO01

HOMCOM Set of Two Floating Bedside Tables, Wall Mounted Nightstand with Drawer and Open Shelf, High Gloss White

HOMCOM Set of Two Floating Bedside Tables, Wall Mounted Nightstand with Drawer and Open Shelf, High Gloss White

Regular price £23.99 GBP
Regular price £29.99 GBP Sale price £23.99 GBP
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

These two HOMCOM bedside tables offer you double the storage for a single package. Set up together in the same space or just separately: do it your way. Made from particle board, each nightstand is solid, featuring a drawer and an open shelf, with a flat top: plenty to hold bedtime essentials. Fixed to the wall, no floor space is required for these floating nightstands.

Features:

  • Two bedside tables for a coordinated, stylish look
  • Floating design frees up floor space and fits any height you prefer
  • Slide-out drawer plus open shelf provide easy-access storage
  • Robust particle board structure built for everyday use
  • Assembly required

Specification:

  • Colour: High Gloss White
  • Material: Particle Board
  • Overall Dimension: 37W x 32D x 21H cm
  • Drawer Inner Size: 29W x 23.5D x 6H cm
  • Open Shelf Size: 34W x 30D x 8.5H cm
  • Weight Capacity: 11kg (total), 3kg (drawer). 3kg (shelf)
  • Item Label: 831-630V82WT

Package Includes:

  • 2 x Floating Bedside Table
  • 1 x Manual
View full details